Spanish authorities have found another wind turbine that was lost from a general cargoship last month.
Rescue agency Salvamento Maritimo said this was the third blade recovered from Krey Schiffahrt's 12,700-dwt BBC Ontario (built 2004), which shed part of its load on 30 June.
The turbine was found at the entrance to the bay of Viveiro.
A large metal structure in which the blades were stored has also been recovered in recent days.