A first cargo from Golar LNG’s newly fired up first floating LNG (FLNG) production unit Hilli Episeyo off Cameroon has arrived in China.
The 146,000-cbm Galicia Spirit (built 2006) arrived at the Jiangsu LNG terminal with a cargo for PetroChina today.
The vessel left Cameroon with its historic shipment on 16 May.
A second vessel, the 146,000-cbm Golar Maria (built 2006) departed the floater off Kribi this week.