The UK energy group said the first LNG from Train 2 set sail aboard the 161,870-cbm LNG carrier Maran Gas Posidonia (built 2014).

At plateau production, expected mid-2016, both trains at QCLNG will be producing enough LNG to load ten vessels per month combined, exporting around 8mt per year.

BG Group said since production from the first train commenced in December 2014, 27 cargoes have been shipped.

“The