The LeTourneau designed Super 116E (Enhanced) Class self-elevatingmobile offshore drilling platform has been ordered by Jindal offshoot DevDrilling Pte.
The rig is designed to operate in water depths of upto 350-ft and will have a rated drilling depth of 30,000-ft.
The construction phase, which will take place atLamprell’s Hamriyah yard, is expected to take about 18 months.
This is the second rig that Lamprell will constructfor Jindal.