The workwill take place on the Lima Platform off the North West coast of the island. Nofinancial terms were disclosed.
It centres on the installation ofnew control taps and a bypass for the main pipeline which supplies 60% ofJakarta’s gas requirements to the mainland.
Hallin will be providing fullsaturation-diving services using equipment built into the 3250-gt subseaoperations vessel (SOV) Ullswater (built2008).
The