The vessel will be built at the shipbuilder’s Ningbo yard and is due to be delivered in 2016. No price details were disclosed.
Subsea rock installation is a proven technique for the protection and stabilisation of offshore structures and pipelines.
The vessel will be suitable for installation of a wide range of rock sizes through a fall pipe or a tremie pipe at the side of the vessel.
With