The ships delivered so far are the Nautilus (built 2006), the Nucleus and Navarin (both built 2007), the Sara (built 2011), the Newton (built 2009), the Ilma (built 2012), the Nautic (built 2008) and the Ingrid (built 2012).

Euronav said the ships were handed over by Maersk Tankers Singapore between 20 February and 19 June.

The Belgian tanker owner said it is due to take over the remaining seven ships by the end of July, except for one vessel.