Vale’s iron ore production slipped in the first quarter of 2025, mirroring the seesawing capesize bulker sector.
Output at the Brazilian mining giant, whose volumes power the benchmark Brazil to China capesize route, fell by 4% year on year to 67.7m tonnes.
The company attributed the decline to high rainfall, although it added that production levels were “as per Vale’s mine plan”.