Would-be importer LNG Croatia has cancelled an ongoing tender to build and operate a floating storage and regasification unit and reissued a fresh enquiry in the market.

The terminal developer said: "It was necessary to revise the technical characteristics and capacities of the initially requested FSRU to reduce the initially planned capital costs of the project and enable the realisation of the project with a lower capacity booking."