An LNG carrier controlled by Golar LNG is scheduled to arrive off the company’s Cameroon-based floating LNG (FLNG) production unit by the end of this month to lift a second cargo from the floater.

Project sources said the 146,000-cbm Golar Maria (built 2006) is scheduled to berth alongside the FLNG unit Hilli Episeyo — situated off Kribi — on 26 May.