BP has launched pre-qualification for competitive engineering studies that could lead to a construction contract at its Tangguh expansion project (pictured).The operator is planning a major build-out at the existing two-train Indonesian LNG export plant.Onshore infrastructure to be added will comprise a 3.8 million tonnes per annum third train, an additional jetty, an LNG storage tank, a condensate storage tank and the necessary related utilities.“Marine