Dutch company C-bed Floating Hotels has fixed out its walk-to-work floatel for windfarm work in the UK.

The Monjasa-owned operator said the 4,400-dwt Wind Innovation (built 1999) will support the installation and commissioning phase of a new 1.2 gigawatt plant off Grimsby.

The former seismic survey ship was bought in 2015 and converted into a floating four-star hotel and project basecamp.