Theshipowner has fixed the 125,000-cbm WilEnergy (built 1983) on a nine monthcontract with a three month option in the charterer’s favour.

Thefixture, which is due to start on 10 November, is expected to net Awilco LNGabout $7.3m in annualized ebitda contributions.

Awilco LNG has been suffering from low fleetutilisation which in the last quarter had fallen to 54 % for its tradingvessels.

TheOslo-based